Purpose-built for temporary water transfer: source → screened suction → primary/backup pumping → transfer line → intermediate pumps/valves/heat manifolds/road crossings → final meter → receiving storage. The questionnaire creates only the applicable PHA nodes and startup checks.
Operating philosophy: Keep the PHA focused on flow, pressure, containment, routing, monitoring, remote control, freezing/heat introduction, and source/destination capacity. This tool is not intended for chemical treatment, process vessels, H₂S process design, or unrelated PSM topics.
Saved PHA Library
Every saved PHA is stored in this browser and can be searched or filtered by customer and job name.
Job Name
Customer / Site
PHA Date
Ops Lead
Rows
High/Crit
Last Saved
Actions
1. Job Information
2. Water Transfer Setup — Brief Questionnaire
Answer these questions. The PHA nodes and questions below will be created automatically.
A. Source
B. Primary Pump Station
C. Transfer Route
D. Destination
E. Operating Limits
3. Generated Transfer Configuration
4. Water Transfer PHA
Only questions applicable to the configured transfer system are generated. Fill in safeguards and actions only where the existing arrangement is not adequate.